Baseline
A baseline is a measure of how long, or how well, the work gets done today, taken before anything changes.
Without one, nobody can say what an AI agent saved; with one, every result has something to be compared against.
By Drayton Highlander, industrial engineer, DH Studios
How we use it at DH Studios
No claim without a receipt: every number we publish has a baseline, a timeframe and a source.
Related terms
Specified. Built. Signed off.
Start with one workflow.
Book a 30-minute call. We look at one workflow together, and you leave with a yes, a no, or a smaller first step.
The first call is free. Pricing is built around your workflow.
Book a 30-min callUsually answers within one business day